Construction of New Roads

Sun Road East Extension (Corridor Upgrade)

Currently, we are producing the detailed designs for a new road that runs through the 12th and 37th khoroo of Bayanzurkh district, connecting the 5.6 km gap between the eastern edge of Sun Road and the Amgalan District intersection.

Street Specification Before construction After construction
Road type 2-р зэрэглэлийн гол зам
Road length 2.8 км
Road width Хамгийн багадаа 3.5 м
Sidewalk width Хамгийн багадаа 2 м
Bicycle path width 1.5м (1 урсгал) 3.0м (2 урсгал)
Parking Зам дагуух автомашины зогсоол
Greenery 2 м өргөн  (замын 2 талд)
Average carriageway speed 50 км/цаг