Construction of New Roads

Selbe River New Road

We are currently producing detailed designs to construct a new road along the west bank of the Selbe River. The proposed road will connect Khailaast Street in the north to Ikh Toiruu in the south. The 2.5 km road, which runs through the 7, 10, 11, 12, 13, and 14th khoroo of Sukhbaatar District, will be built from the ground up under the Complete Streets concept to ensure accessibility and comfort for all road users.

Street Specification Before construction After construction
Road type Secondary trunk road
Road length 2.8 km
Road width At least 3.5 m
Sidewalk width At least 2 m
Bicycle path width 1.5m (1 lane); 3.0m (2 lane)
Parking Parkings spots of at least 2.5 x 6 meters will be constructed along the road
Greenery At least 2 meters of greenery along both sides of the road
Environmental benefits Reconstruction will strengthen dams along the Selbe River
Average carriageway speed 50 km/h
Movement intensity The road will take on 33850 cars a day by 2030 and reduce congestion on the adjacent 7 Buudal Road and Dari-Ekh Street by 8.4% and 30.3%, respectively
Өмнөх